AMMROC GRE

Military MRO Requires Super-Sized GRE

Detalles del Proyecto

Ubicación: Al Ain International Airport
Al Ain, United Arab Emirates
Proyecto: Engine Run Bay
Dueño: AMMROC
Desafíos:
  • Challenging site geometry
  • Tight conformance to applicable regulations
  • Challenging aerodynamics

BDI’s third GRE to be designed specifically to support a defense aircraft MRO facility, the first being a C-5 GRE for the USAF and the second for the Malaysian Air Force at Subang. The AMMROC GRE can accommodate up to an A330 and is capable of withstanding the high temperatures and velocities associated with afterburner aircraft. BDI also supplied the embedded aircraft anchor used to secure fighter aircraft during power check run-ups, which complies with strict military requirements.

Request Information

Solicite Información

Para recibir información específica de como BDI podría cumplir con los requisitos de su próximo proyecto, favor de