Detalles del Proyecto
Ubicación: Ramstein Air Base
Rhineland-Palatinate, Germany
Proyecto: Ramp 5 Jet Blast Deflector Replacement
Contratista: Keren Construction
Dueño: United States Air Force
DesafÃos:
- Thrust rating required extremely heavy-duty structure
- Tight conformance to applicable regulations
The USAF required a 5.7-meter (19-foot) tall deflector for full power run-ups of C-130, C-5, and C-17 aircraft. Upon completion of the project, proof tests were carried out with a C-17.
Para recibir información especÃfica de como BDI podrÃa cumplir con los requisitos de su próximo proyecto, favor de