Project Details
Location: Prince Mohammed Bin Abdulaziz International Airport
Madinah, Saudi Arabia
Project: EPC Project (MAJV)
Contractor: TAV Construction
Owner: The Saudi General Authority of Civil Aviation
Challenges:
- Remote project location
- Tight conformance to applicable regulations
- Very short lead-time to perform the design and delivery
The new terminal at Madinah features an “L” shaped configuration of BDIās G20NB-6, which is a 6-meter (20-foot) tall jet blast deflector.
For specific information on how BDI might meet the requirements of your next project, please